052-5927592 17 Tzahal Street, Ness Ziona Sun-Thu 09:00-19:00, Fri 09:00-12:30

One year: how long do you have to notify the contractor?

Deadlines for notifying the contractor in a 30-second video

Video transcript

I measure the time you have to notify the contractor. A defect that could already be found at delivery must be reported to the contractor within one year of delivery. A hidden defect: report it within a reasonable time after discovery. Always in writing, with a description and the date of discovery. A proper letter to the contractor can be produced with the generator on the site, and the inspection-period calculator shows the periods for each defect.

Full explanation: Inspection and warranty period calculator. How long is the developer liable for a defect? Calculator of the inspection and warranty periods under the Sale (Apartments) Law: for each type of defect, end of inspection period, end of warranty period, fundamental non-conformity and notice deadlines.

The video is embedded from YouTube in privacy-enhanced mode. Watch on YouTube

Need a lawyer or a notary?

A short initial consultation call, to understand whether and how we can help.

Call WhatsApp Form